Skip Navigation

InitialsDiceBearhttps://github.com/dicebear/dicebearhttps://creativecommons.org/publicdomain/zero/1.0/„Initials” (https://github.com/dicebear/dicebear) by „DiceBear”, licensed under „CC0 1.0” (https://creativecommons.org/publicdomain/zero/1.0/)SS
Posts
5
Comments
68
Joined
1 yr. ago

  • I drilled two holes at the ends of the post. Tied a knot in the top end, wound my way down, then ended with a clove hitch to maintain three tension, and put the excess through the other hole and tied another knot just for extra security

  • I'd recommend using something like 3/8 ply, instead of the 3/4 I used, you'll save a ton of weight. For joining vertical and horizontal surfaces I used a few, small L-brackets and a couple blocks that doubled as reinforcement

  • I didn't really plan it, so sequencing building the frame vs attaching the carpet was a little annoying, but overall not bad at all.

    This isn't the first one I've made for them, but I used spray adhesive on the first, which wasn't nearly effective enough. This time I used carpet adhesive, which was more cost effective and seems to be much more effective. Downside to that, though is that I had to wait 24 hours after carpeting a piece to attach it

  • Probably being held at gunpoint by a guard at a Jordanian airbase that I was inside of, doing a timed ruck march, as a US soldier.

    I didn't speak his dialect, so I couldn't pick up much, but my gut said he was pissed he was on guard overnight and decided to ruin my night, too.

    Only like the initial 15-30 seconds were really stressful, it was largely just annoying, since I couldn't communicate with anyone, standing there with my ruck on the ground and my hands up.