Electricity production at the Olkiluoto 3 nuclear power facility was interrupted at around 7pm on Sunday due to a fault detected in the turbine plant, operator Teollisuuden Voima (TVO) has said in a statement.
Agreed.
Fix the situation internally before we can help those externally. I'm all for providing help to those that need it, but when we don't have the resources to help anyone, we need to do something about it.
Might want to look into Unihertz. Specifically: https://www.unihertz.com/products/jelly-star
3 inch screen.